Collano Electric Boxes
As of 2007, trains will whisk passengers and rail cargo through the new Lötschberg base tunnel at about 200 km/h. The latest technologies for tunnel and rolling stock construction, precision work – and not least of all – Collano specialty adhesives ensure safe travel through the mountain.
Download document here